Project
TIRUVALLUR P1 HIGHWAY
Conversion of existing 2 lane highway to Access Controlled 4 lane highway with Paved Shoulders from Tiruvallur (Design Chainage Km 17+56) to TN/AP Broder (Design Chainage Km 61+51) o NH-716 in Tamil Nadu on Hybrid Annuity Mode under NH(O) (Project Length – 43.95 km) (Chennai-Tirupati Package-1)
- Operation Period of 15 (Fifteen) years
- Type of Pavement – Flexible
- Length of Main Carriageway – 43.950 Km
- Length of Service Road – 82.227 Km
- Major Bridges – 03 Nos.
- Minor Bridges – 11 Nos.
- Flyover & Underpasses – 14 Nos.
- Main Toll Plaza – 1 No.
- Entry Exit Toll Plaza – 4 locations